Misplaced Pages

Business Process Model and Notation

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Graphical representation for specifying business processes
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
A major contributor to this article appears to have a close connection with its subject. It may require cleanup to comply with Misplaced Pages's content policies, particularly neutral point of view. Please discuss further on the talk page. (February 2019) (Learn how and when to remove this message)
This article may rely excessively on sources too closely associated with the subject, potentially preventing the article from being verifiable and neutral. Please help improve it by replacing them with more appropriate citations to reliable, independent, third-party sources. (February 2019) (Learn how and when to remove this message)
(Learn how and when to remove this message)
Example of a Business Process Model and Notation for a process with a normal flow

Business Process Model and Notation (BPMN) is a graphical representation for specifying business processes in a business process model.

Originally developed by the Business Process Management Initiative (BPMI), BPMN has been maintained by the Object Management Group (OMG) since the two organizations merged in 2005. Version 2.0 of BPMN was released in January 2011, at which point the name was amended to Business Process Model and Notation to reflect the introduction of execution semantics, which were introduced alongside the existing notational and diagramming elements. Though it is an OMG specification, BPMN is also ratified as ISO 19510. The latest version is BPMN 2.0.2, published in January 2014.

Overview

Business Process Model and Notation (BPMN) is a standard for business process modeling that provides a graphical notation for specifying business processes in a Business Process Diagram (BPD), based on a flowcharting technique very similar to activity diagrams from Unified Modeling Language (UML). The objective of BPMN is to support business process management, for both technical users and business users, by providing a notation that is intuitive to business users, yet able to represent complex process semantics. The BPMN specification also provides a mapping between the graphics of the notation and the underlying constructs of execution languages, particularly Business Process Execution Language (BPEL).

BPMN has been designed to provide a standard notation readily understandable by all business stakeholders, typically including business analysts, technical developers and business managers. BPMN can therefore be used to support the generally desirable aim of all stakeholders on a project adopting a common language to describe processes, helping to avoid communication gaps that can arise between business process design and implementation.

BPMN is one of a number of business process modeling language standards used by modeling tools and processes. While the current variety of languages may suit different modeling environments, there are those who advocate for the development or emergence of a single, comprehensive standard, combining the strengths of different existing languages. It is suggested that in time, this could help to unify the expression of basic business process concepts (e.g., public and private processes, choreographies), as well as advanced process concepts (e.g., exception handling, transaction compensation).

Two new standards, using a similar approach to BPMN have been developed, addressing case management modeling (Case Management Model and Notation) and decision modeling (Decision Model and Notation).

Topics

Scope

BPMN is constrained to support only the concepts of modeling applicable to business processes. Other types of modeling done by organizations for non-process purposes are out of scope for BPMN. Examples of modeling excluded from BPMN are:

  • Organizational structures
  • Functional breakdowns
  • Data models

In addition, while BPMN shows the flow of data (messages), and the association of data artifacts to activities, it is not a data flow diagram.

Elements

BPMN models are expressed by simple diagrams constructed from a limited set of graphical elements. For both business users and developers, they simplify understanding of business activities' flow and process. BPMN's four basic element categories are:

Flow objects
Events, activities, gateways
Connecting objects
Sequence flow, message flow, association
Swim lanes
Pool, lane, Dark Pool
Artifacts
Data object, group, annotation

These four categories enable creation of simple business process diagrams (BPDs). BPDs also permit making new types of flow object or artifact, to make the diagram more understandable.

Flow objects and connecting objects

  • Event Event
  • Activity Activity
  • Gateway Gateway
  • Connections Connections

Flow objects are the main describing elements within BPMN, and consist of three core elements: events, activities, and gateways.

Event

An Event is represented with a circle and denotes something that happens (compared with an activity, which is something that is done). Icons within the circle denote the type of event (e.g., an envelope representing a message, or a clock representing time). Events are also classified as Catching (for example, if catching an incoming message starts a process) or Throwing (such as throwing a completion message when a process ends).
Start event
Acts as a process trigger; indicated by a single narrow border, and can only be Catch, so is shown with an open (outline) icon.
Intermediate event
Represents something that happens between the start and end events; is indicated by a double border, and can Throw or Catch (using solid or open icons as appropriate). For example, a task could flow to an event that throws a message across to another pool, where a subsequent event waits to catch the response before continuing.
End event
Represents the result of a process; indicated by a single thick or bold border, and can only Throw, so is shown with a solid icon.

Activity

An activity is represented with a rounded-corner rectangle and describes the kind of work which must be done. An activity is a generic term for work that a company performs. It can be atomic or compound.
Task
A task represents a single unit of work that is not or cannot be broken down to a further level of business process detail. It is referred to as an atomic activity. A task is the lowest level activity illustrated on a process diagram. A set of tasks may represent a high-level procedure.
Sub-process
Used to hide or reveal additional levels of business process detail. When collapsed, a sub-process is indicated by a plus sign against the bottom line of the rectangle; when expanded, the rounded rectangle expands to show all flow objects, connecting objects, and artifacts. A sub-process is referred to as a compound activity.
Has its own self-contained start and end events; sequence flows from the parent process must not cross the boundary.
Transaction
A form of sub-process in which all contained activities must be treated as a whole; i.e., they must all be completed to meet an objective, and if any one of them fails, they must all be compensated (undone). Transactions are differentiated from expanded sub-processes by being surrounded by a double border.
Call Activity
A point in the process where a global process or a global Task is reused. A call activity is differentiated from other activity types by a bolded border around the activity area.

Gateway

A gateway is represented with a diamond shape and determines forking and merging of paths, depending on the conditions expressed.
Exclusive
Used to create alternative flows in a process. Because only one of the paths can be taken, it is called exclusive.
Event Based
The condition determining the path of a process is based on an evaluated event.
Parallel
Used to create parallel paths without evaluating any conditions.
Inclusive
Used to create alternative flows where all paths are evaluated.
Exclusive Event Based
An event is being evaluated to determine which of mutually exclusive paths will be taken.
Complex
Used to model complex synchronization behavior.
Parallel Event Based
Two parallel processes are started based on an event, but there is no evaluation of the event.

Connections

Flow objects are connected to each other using Connecting objects, which are of three types: sequences, messages, and associations.

Sequence Flow
A Sequence Flow is represented with a solid line and arrowhead, and shows in which order the activities are performed. The sequence flow may also have a symbol at its start, a small diamond indicates one of a number of conditional flows from an activity, while a diagonal slash indicates the default flow from a decision or activity with conditional flows.
Message Flow
A Message Flow is represented with a dashed line, an open circle at the start, and an open arrowhead at the end. It tells us what messages flow across organizational boundaries (i.e., between pools). A message flow can never be used to connect activities or events within the same pool.
Association
An Association is represented with a dotted line. It is used to associate an Artifact or text to a Flow Object, and can indicate some directionality using an open arrowhead (toward the artifact to represent a result, from the artifact to represent an input, and both to indicate it is read and updated). No directionality is used when the Artifact or text is associated with a sequence or message flow (as that flow already shows the direction).

Pools, Lanes, and artifacts

  • Swimlanes Swimlanes
  • Data objects Data objects
  • Groups Groups
  • Annotation Annotation

Swim lanes are a visual mechanism of organising and categorising activities, based on cross functional flowcharting, and in BPMN consist of two types:

Pool
Represents major participants in a process, typically separating different organisations. A pool contains one or more lanes (like a real swimming pool). A pool can be open (i.e., showing internal detail) when it is depicted as a large rectangle showing one or more lanes, or collapsed (i.e., hiding internal detail) when it is depicted as an empty rectangle stretching the width or height of the diagram.
Lane
Used to organise and categorise activities within a pool according to function or role, and depicted as a rectangle stretching the width or height of the pool. A lane contains the flow objects, connecting objects and artifacts.

Artifacts allow developers to bring some more information into the model/diagram. In this way the model/diagram becomes more readable. There are three pre-defined Artifacts, and they are:

  • Data objects: Data objects show the reader which data is required or produced in an activity.
  • Group: A Group is represented with a rounded-corner rectangle and dashed lines. The group is used to group different activities but does not affect the flow in the diagram.
  • Annotation: An annotation is used to give the reader of the model/diagram an understandable impression.

Examples of business process diagrams

  • Click on small images for full-size version
  • Discussion cycle Discussion cycle
  • E-mail voting process E-mail voting process
  • Collect votes Collect votes

BPMN 2.0.2

The vision of BPMN 2.0.2 is to have one single specification for a new Business Process Model and Notation that defines the notation, metamodel and interchange format but with a modified name that still preserves the "BPMN" brand. The features include:

  • Formalizes the execution semantics for all BPMN elements.
  • Defines an extensibility mechanism for both Process model extensions and graphical extensions.
  • Refines Event composition and correlation.
  • Extends the definition of human interactions.
  • Defines a Choreography model.

The current version of the specification was released in January 2014.

Comparison of BPMN versions

This section may be too technical for most readers to understand. Please help improve it to make it understandable to non-experts, without removing the technical details. (December 2012) (Learn how and when to remove this message)
This section needs to be updated. Please help update this article to reflect recent events or newly available information. (February 2014)
Attributes BPMN 1.0 BPMN 1.1 BPMN 1.2 BPMN 2.0
Consortium BPMI & iGrafx OMG OMG OMG
Date of release May 2004 January 2008 January 2009 January 2011
Models
  • Collaborative (public) B2B processes,
  • internal (private) business processes.
  • collaborative (public) B2B processes,
  • internal (private) business processes,
  • a choreography – expected behavior between two or more business participants,
  • collaborations, which is a collection of participants and their interaction and
  • a conversation – the logical relation of message exchanges.
event
  • start (none, message, timer, rule, link, multiple)
  • intermediate (none, message, timer, error, cancel, compensation, rule, link, multiple)
  • end (none, message, error, cancel, compensation, link, terminate, multiple)
  • start (none, message, timer, conditional, signal, multiple)
  • intermediate (none, message, timer, error, cancel, compensation, conditional, link, signal, multiple)
  • end (none, message, error, cancel, compensation, signal, terminate, multiple)
  • start
    • top-level (none, message, timer, conditional, signal, multiple, parallel multiple)
    • event sub-process interrupting (message, timer, escalation, conditional, error, compensation, signal, multiple, parallel multiple)
    • event sub-process non-interrupting (message, timer, escalation, conditional, signal, multiple, parallel multiple)
  • intermediate
    • catching (message, timer, conditional, link, signal, multiple, parallel multiple)
    • boundary interrupting (message, timer, escalation, conditional, error, cancel, compensation, signal, multiple, parallel multiple)
    • boundary non-interrupting (message, timer, escalation, conditional, signal, multiple, parallel multiple, terminate)
    • throwing (none, message, escalation, link, compensation, signal, multiple, parallel multiple)
  • end (none, message, escalation, error, cancel, compensation, signal, multiple, terminate)
activity
  • task (atomic)
  • process/sub-process (nonatomic)
    • collapsed sub-process
    • expanded sub-process
  • task (atomic)
  • choreography task
    • collapsed choreography sub-process
    • expanded choreography sub-process
  • process/sub-process (nonatomic)
    • collapsed sub-process
    • expanded sub-process
gateway
  • XOR – exclusive decision and merging. both data-based and event-based. data-based can be shown with or without the "x" marker.
  • OR – inclusive decision and merging
  • complex – complex conditions and situations
  • AND – forking and joining
  • exclusive decision and merging. both data-based and event-based. data-based can be shown with or without the "x" marker.
  • inclusive decision and merging.
  • complex – complex conditions and situations.
  • parallel forking and joining.
  • exclusive decision and merging. both data-based and event-based. exclusive can be shown with or without the "x" marker.
  • inclusive gateway decision and merging
  • complex gateway – complex conditions and situations
  • parallel gateway – forking and joining
sequence flow

normal flow
uncontrolled flow
conditional flow
default flow
exception flow

message flow message flow
association association
pool pool
lane lane
data objects data object
  • data object
    • collection
    • data input
    • data output
groups group
annotations annotations
message message
other elements
  • looping
    • activity looping
    • sequence flow looping
  • multiple instances
  • process break
  • transactions
  • nested/embedded sub-process
  • off-page connector
  • compensation association
  • looping
    • activity looping
    • sequence flow looping
  • multiple instances
  • process break
  • transactions
  • nested/embedded sub-process
  • off-page connector
  • compensation association
  • communication (subcommunication)
  • communication link
Number of all elements 48 55 55 116
Major changes
  • The new specification introduces a categorization of event triggers into "catching" and "throwing" events. I.e. there are two kinds of intermediate message events now – one kind responsible for reception of messages ("catching") and one kind responsible for sending messages ("throwing").
  • In addition to the old types, it introduces a new type, the signal event.
  • Start and end link events do not exist any longer in BPMN 1.1.
  • The old "rule events" were renamed to conditional events. The semantics and appearance have not changed.
  • The event-based gateway in BPMN 1.1 looks slightly different from what it looked like in 1.0. Instead of the hexagonal star it now has a pentagon in its center. The same shape is also used for the multiple events (start, intermediate, end).
  • There is an additional line separating your lane's description from its content.

The BPMN 1.2 minor revision changes consist of editorial corrections and implementation bug fixes. Consequently, these minor changes affect modeling tool vendors more than modelers (users).

  • Choreographies
    • Choreographies-model
    • Conversation-model
  • Complete Metamodel
  • BPMN Core
  • BPMN Execution Semantics
  • BPMN – BPEL Mapping
  • XPDL (BPMN XML Serialization)
  • Diagram Interchange
  • Elements For Abstraction
    • Callable Element
    • Call Activity
    • Global Task
  • Gateways (Updated)
    • Exclusive/Parallel Event-based Gateway (they stand at the beginning of the process)
  • Tasks/SubProcesses (Updated)
    • Event-Subprocess (Used to handle events in the bounding subprocess)
    • BusinessRule task
    • Sequential Multi-Instance Activity
    • Service Task
  • Artifacts (Updated)
    • Data Objects (Collection, Data Input, Data Output)

Types of BPMN sub-model

Business process modeling is used to communicate a wide variety of information to a wide variety of audiences. BPMN is designed to cover this wide range of usage and allows modeling of end-to-end business processes to allow the viewer of the Diagram to be able to easily differentiate between sections of a BPMN Diagram. There are three basic types of sub-models within an end-to-end BPMN model: Private (internal) business processes, Abstract (public) processes, and Collaboration (global) processes:

Private (internal) business processes
Private business processes are those internal to a specific organization and are the type of processes that have been generally called workflow or BPM processes. If swim lanes are used then a private business process will be contained within a single Pool. The Sequence Flow of the Process is therefore contained within the Pool and cannot cross the boundaries of the Pool. Message Flow can cross the Pool boundary to show the interactions that exist between separate private business processes.
Abstract (public) processes
This represents the interactions between a private business process and another process or participant. Only those activities that communicate outside the private business process are included in the abstract process. All other “internal” activities of the private business process are not shown in the abstract process. Thus, the abstract process shows to the outside world the sequence of messages that are required to interact with that business process. Abstract processes are contained within a Pool and can be modeled separately or within a larger BPMN Diagram to show the Message Flow between the abstract process activities and other entities. If the abstract process is in the same Diagram as its corresponding private business process, then the activities that are common to both processes can be associated.
Collaboration (global) processes
A collaboration process depicts the interactions between two or more business entities. These interactions are defined as a sequence of activities that represent the message exchange patterns between the entities involved. Collaboration processes may be contained within a Pool and the different participant business interactions are shown as Lanes within the Pool. In this situation, each Lane would represent two participants and a direction of travel between them. They may also be shown as two or more Abstract Processes interacting through Message Flow (as described in the previous section). These processes can be modeled separately or within a larger BPMN Diagram to show the Associations between the collaboration process activities and other entities. If the collaboration process is in the same Diagram as one of its corresponding private business process, then the activities that are common to both processes can be associated.

Within and between these three BPMN sub-models, many types of Diagrams can be created. The following are the types of business processes that can be modeled with BPMN (those with asterisks may not map to an executable language):

  • High-level private process activities (not functional breakdown)*
  • Detailed private business process
  • As-is or old business process*
  • To-be or new business process
  • Detailed private business process with interactions to one or more external entities (or “Black Box” processes)
  • Two or more detailed private business processes interacting
  • Detailed private business process relationship to Abstract Process
  • Detailed private business process relationship to Collaboration Process
  • Two or more Abstract Processes*
  • Abstract Process relationship to Collaboration Process*
  • Collaboration Process only (e.g., ebXML BPSS or RosettaNet)*
  • Two or more detailed private business processes interacting through their Abstract Processes and/or a Collaboration Process

BPMN is designed to allow all the above types of Diagrams. However, it should be cautioned that if too many types of sub-models are combined, such as three or more private processes with message flow between each of them, then the Diagram may become difficult to understand. Thus, the OMG recommends that the modeler pick a focused purpose for the BPD, such as a private or collaboration process.

Comparison with other process modeling notations

Event-driven process chains (EPC) and BPMN are two notations with similar expressivity when process modeling is concerned. A BPMN model can be transformed into an EPC model. Conversely, an EPC model can be transformed into a BPMN model with only a slight loss of information. A study showed that for the same process, the BPMN model may need around 40% fewer elements than the corresponding EPC model, but with a slightly larger set of symbols. The BPMN model would therefore be easier to read. The conversion between the two notations can be automated.

UML activity diagrams and BPMN are two notations that can be used to model the same processes: a subset of the activity diagram elements have a similar semantic than BPMN elements, despite the smaller and less expressive set of symbols. A study showed that both types of process models appear to have the same level of readability for inexperienced users, despite the higher formal constraints of an activity diagram.

BPM Certifications

The Business Process Management (BPM) world acknowledges the critical importance of modeling standards for optimizing and standardizing business processes. The Business Process Model and Notation (BPMN) version 2 has brought significant improvements in event and subprocess modeling, significantly enriching the capabilities for documenting, analyzing, and optimizing business processes.

Elemate positions itself as a guide in exploring the various BPM certifications and dedicated training paths, thereby facilitating the mastery of BPMN and continuous improvement of processes within companies.

OMG OCEB certification

The Object Management Group (OMG), the international consortium behind the BPMN standard, offers the OCEB certification (OMG Certified Expert in BPM). This certification specifically targets business process modeling with particular emphasis on BPMN 2. The OCEB certification is structured into five levels: Fundamental, Business Intermediate (BUS INT), Technical Intermediate (TECH INT), Business Advanced (BUS ADV), and Technical Advanced (TECH ADV), thus providing a comprehensive pathway for BPM professionals.

Other BPM certifications

Beyond the OCEB, there are other recognized certifications in the BPM field:

  • CBPA (Certified Business Process Associate): Offered by the ABPMP (Association of Business Process Management Professionals), this certification is aimed at professionals starting in BPM.
  • CBPP (Certified Business Process Professional): Also awarded by the ABPMP, the CBPP certification targets experienced professionals, offering validation of their global expertise in BPM.

The interest of a BPMN certification

While BPMN 2 has established itself as an essential standard in business process modeling, a specific certification for BPMN could provide an additional guarantee regarding the quality and compliance of the models used. This becomes particularly relevant when companies employ external providers for the modeling of their business processes.

BPM certifying training with BPMN 2

Although OMG does not offer a certification exclusively dedicated to BPMN 2, various organizations provide certifying training that encompasses this standard. These trainings cover not just BPMN but also the principles of management, automation, and digitization of business processes. They enable learners to master process mapping and modeling using BPMN 2, essential for optimizing business operations.

See also

References

  1. ^ OMG. "BPMN 2.0". Retrieved 2011-03-29.
  2. "About the Business Process Model and Notation Specification Version 2.0.2". www.omg.org. Retrieved 2020-12-07.
  3. An XML Representation for Crew Procedures, Richard C. Simpson (2004), Final Report NASA Faculty Fellowship Program (Johnson Space Center)
  4. Process Modeling Notations and Workflow Patterns Archived July 6, 2010, at the Wayback Machine, paper by Stephen A. White of IBM Corporation (2006)
  5. Stephen A. White (3 May 2004). "Business Process Modeling Notation v1.0" (PDF). Archived from the original (PDF) on 18 August 2013. for the Business Process Management Initiative (BPMI)
  6. OMG. "BPMN Working Draft" (PDF). Archived from the original (PDF) on 2018-05-24. Retrieved 2012-05-01.
  7. "BPMN FAQ". Retrieved 2015-02-05.
  8. Grigorova, Katalina; Mironov, Kaloyan (September 2014). "Comparison of business process modeling standards". International Journal of Engineering Sciences & Management Research. ISSN 2349-6193.
  9. Levina, Olga (September 2012). "Assessing Information Loss in EPC to BPMN Business Process Model Transformation". 2012 IEEE 16th International Enterprise Distributed Object Computing Conference Workshops. IEEE. pp. 51–55. doi:10.1109/EDOCW.2012.38. ISBN 9781467350051. S2CID 18834263.
  10. Kotsev, Vladimir; Stanev, Ivan; Grigorova, Katalina (April 2011). "BPMN-EPC-BPMN Converter". НАУЧНИ ТРУДОВЕ НА РУСЕНСКИЯ УНИВЕРСИТЕТ.
  11. GEAMBAŞU, Cristina Venera (2012). "BPMN vs. UML activity diagram for business process modeling". Accounting and Management Information Systems. 11, n.4: 637–651. S2CID 15301141.
  12. LIMELE, Maena (2023-12-01). "Certification BPMN : formations et compétences". Elemate (in French). Retrieved 2024-02-28.

Further reading

  • Grosskopf, Decker and Weske. (Feb 28, 2009). The Process: Business Process Modeling using BPMN. Meghan Kiffer Press. ISBN 978-0-929652-26-9. Archived from the original on April 30, 2019. Retrieved July 9, 2020.
  • Ryan K. L. Ko, Stephen S. G. Lee, Eng Wah Lee (2009) Business Process Management (BPM) Standards: A Survey. In: Business Process Management Journal, Emerald Group Publishing Limited. Volume 15 Issue 5. ISSN 1463-7154. PDF
  • Stephen A. White; Conrad Bock (2011). BPMN 2.0 Handbook Second Edition: Methods, Concepts, Case Studies and Standards in Business Process Management Notation. Future Strategies Inc. ISBN 978-0-9849764-0-9.

External links

Business Process Model and Notation at Misplaced Pages's sister projects:
ISO standards by standard number
List of ISO standardsISO romanizationsIEC standards
1–9999
10000–19999
20000–29999
30000+
Categories: