The Druzhba pipeline (Russian: нефтепровод «Дружба», Czech: Ropovod Družba), also referred to as the Friendship Pipeline and the Comecon Pipeline, is one of the world's longest oil pipelines and one of the largest oil pipeline networks in the world. It began operation in 1964 and remains in operation today. It carries oil some 4,000 kilometres (2,500 mi) from the eastern part of European Russia to points in Ukraine, Belarus, Poland, Hungary, Slovakia, the Czech Republic and Germany. The network also branches out into numerous smaller pipelines to deliver its product throughout Eastern Europe and beyond.
The name "Druzhba" means "friendship", alluding to the fact that the pipeline established friendly relations between the Soviet Union and Eastern Europe through the reliable supply of oil. Today, it is the largest principal artery for the transportation of Russian and Kazakh oil across Europe.
History
On 18 December 1958, the 10th session of the Council for Mutual Economic Assistance (Comecon), held in Prague, adopted a decision and an agreement was signed on construction of a trunk crude oil pipeline from the USSR into Poland, Czechoslovakia, GDR and Hungary. The construction of the initially proposed 5,327 kilometres (3,310 mi) long pipeline commenced in 1960. Each country was to supply all necessary construction materials, machinery and equipment. Czechoslovakia received first oil in 1962, Hungary in September 1963, Poland in November 1963, and the GDR in December 1963. The whole pipeline was put into operation in October 1964. The first oil pumped through the Druzhba pipeline originated from the oil fields in Tatarstan and Samara (Kuybyshev) Oblast. In the 1970s, the Druzhba pipeline system was further enlarged with the construction of geographically parallel lines.
Following the 2022 Russian invasion of Ukraine, the northern route to Germany was closed with Germany ceasing to buy oil in January 2023 and Russia ceasing to supply oil to Poland in February 2023. From December 2023, following agreements, Germany began importing 1.2 million tons of oil per year from Kazakhstan using the northern pipeline.
In July 2024, the government of Ukraine stopped the transportation of Lukoil oil through the Druzhba pipeline to Slovakia and Hungary.
Route
The pipeline begins at Almetyevsk in Tatarstan, where it collects oil from western Siberia, the Urals, and the Caspian Sea. It runs to Mazyr in southern Belarus, where it splits into a northern and southern branch. The northern branch crosses the remainder of Belarus across Poland to Schwedt in Germany. It supplies refineries in Płock and in Schwedt. The northern branch is also connected by the Płock–Gdańsk pipeline with the Naftoport terminal in Gdańsk, which is used for oil re-exports. In Schwedt, the Druzhba pipeline is connected with the MVL pipeline to Rostock and Spergau. The southern branch runs south through Ukraine. In Brody, the Druzhba pipeline is connected with the Odesa-Brody pipeline, which is currently used to ship oil from the Druzhba pipeline to the Black Sea. In Uzhhorod, the pipeline splits into lines to Slovakia (Druzhba-1 — original Druzhba route) and to Hungary (Druzhba-2). The line through Slovakia is divided once again near Bratislava: one branch leading in a northwest direction to the Czech Republic and the other going southward to Hungary. The Druzhba-1 pipeline branches off toward Hungary in Banská Bystrica Region (Slovakia) near the river of Ipeľ, crosses the Hungarian border at Drégelypalánk and leads to Százhalombatta (not depicted on the map at the beginning of the page). In Hungary, the Druzhba-1 pipeline supplies the Duna refinery while Druzhba-2 supplies Duna and Tisza refineries.
The ORLEN Lietuva in Lithuania and Ventspils oil terminal in Latvia are connected to the main pipeline by the branch pipeline from the Unecha junction in Bryansk Oblast (not shown on the map). This branch has ceased operation in 2006 and is not likely to become operational again any time soon.
The part of the Druzhba pipeline system which runs via Belarus is 2,910 kilometres (1,810 mi) long. The length of the pipeline in Ukraine is 1,490 kilometres (930 mi), in Poland 670 kilometres (420 mi), in Hungary 130 kilometres (80 mi), in Lithuania 332 kilometres (206 mi), in Latvia 420 kilometres (261 mi), and in Slovakia and in the Czech Republic together around 400 kilometres (250 mi). The pipeline crosses 45 major rivers as well as 200 railways and highways.
Technical features
The pipes for the project were manufactured in the Soviet Union and Poland, while fittings were manufactured in Czechoslovakia. The GDR was responsible for pumps, and Hungary for automation and communication equipment. The construction cost nearly 400 million rubles and nearly 730,000 tons of pipe was laid throughout the path of the pipeline. The Druzhba pipeline currently has a capacity of 1.2 to 1.4 million barrels per day (190×10^ to 220×10^ m/d). Work is currently underway to increase this in the section between Belarus and Poland. The pipe diameter of the pipeline varies from 420 to 1,020 millimetres (17 to 40 in). It uses 20 pumping stations.
Operators
The Russian part of the pipeline is operated by the oil company Transneft through its subsidiary OAO MN Druzhba. The operator in Belarus is Gomeltransneft Druzhba, in Ukraine UkrTransNafta, in Poland PERN Przyjazn SA, in Slovakia Transpetrol AS, in the Czech Republic Mero, and in Hungary MOL.
Baltic Pipeline System-2
Main article: Baltic Pipeline System-IIThe Baltic Pipeline System-2 (BPS-2) is a pipeline from the Unecha junction of the Druzhba pipeline near the Russia–Belarus border to the Ust-Luga oil terminal at the eastern part of the Gulf of Finland with a 172 kilometres (107 mi) long branch line to Kirishi oil refinery. The throughput capacity of BPS-2 is 50 million tonnes of oil annually. The construction of the BPS-2 started on 10 June 2009. The BPS-2 was completed in 2011 and began to function in late March 2012.
Proposed extensions
This section needs additional citations for verification. Please help improve this article by adding citations to reliable sources in this section. Unsourced material may be challenged and removed.
Find sources: "Druzhba pipeline" – news · newspapers · books · scholar · JSTOR (July 2024) (Learn how and when to remove this message)
- Druzhba Adria
The Druzhba–Adria Pipeline Integration Project was a proposal that was considered in the 2000s to extend the pipeline to pass through Hungary and Croatia to reach the Adriatic Sea at the deep-water port of Omišalj. In the first phase, the Croatian portion of the Adria pipeline would be reconstructed from the Sisak pumping station to Omišalj harbour. The Croatian company JANAF was responsible for the design of the initial project phase, to reverse the phases of the Adria pipeline (which currently carries oil from the port inland) on the Sisak-Omišalj portion.
It was also proposed to connect Druzhba Adria with the planned Pan-European Pipeline.
The proposal was touted by the Croatian president Stipe Mesić, but it also garnered a lot of negative press due to complaints from the environmentalist groups such as Eko Kvarner, and was eventually abandoned.
- Schwechat–Bratislava Oil Pipeline
The Schwechat–Bratislava two-way oil pipeline project was proposed in 2003. It would allow to supply the OMV owned Schwechat Refinery from the Druzhba pipeline.
Controversies
2009 Parallel disputes on transit fees
Main article: Russia–Ukraine gas disputesFor the last several years, Russia and Ukraine have been tied up in transit fee disputes as the major pipelines supplying Europe with Russian oil and gas run through Ukraine. The continuous disputes were primarily based on transit of natural gas. On December 28, 2009, referring to Russia's announcement, Slovakian government said Russia issued warnings that it would stop oil supplies to Slovakia, Hungary and the Czech Republic over a transit fees dispute with Ukraine. However, the next day, Ukraine's Naftogas issued a statement confirming that Russia agreed to a 30 percent increase in the transit fees through Ukraine. The alleged rise in the tariff will be from $7.8 to $9.50 (or €6.6) per tonne of oil for transiting Ukraine in 2010, and this was implemented due to the decision from Russia to raise prices of the energy resources. Additionally, unlike previous payments, new payments will be made in Euros, as this was one of Ukraine's demands. Also, Ukraine needs substantial investments to update the network on its territory as the pipeline has aged. Russia and Ukraine also agreed on the volume of oil to be transported through Ukraine in 2010. The overall amount of oil to be transported to Slovakia, the Czech Republic and Hungary through Ukraine in 2010 will be 15 million tonnes, a decrease from 17.1 million tonnes in 2008.
2019 oil contamination scandal
The delivery of oil was halted on 20 April 2019 due to high concentrations of organic chloride found in the pipeline. These chemical compounds contaminated the pipeline and equipment in Russia and Europe causing an economic impact of billions of dollars. Investigation into the scandal is ongoing with individuals being detained in Russia suspected of having stolen oil and pouring in organochloride to the pipeline to cover up the theft.
Disputes over payment for contaminated oil were ongoing a month later.
By late May, a month after the contamination was discovered, Russia agreed to take back some of the 8-9m tons of contaminated oil remaining in the pipeline.
Estimates of overall contaminated stock, including that still in the pipeline and other stock pumped to tankers or to storage range from 20-40m tons as of end May. This stock will all require dilution before it can be refined.
In mid-September 2019, almost five months after the contamination was noticed, the Polish pipeline operator confirmed their section of the pipeline had been cleared of contamination and was operating normally. 450,000 tons of contaminated oil had been moved to storage.
Also in September 2019, oil companies BP and Total were trying to sell 2.3m barrels (over 300,000 tons) of tainted oil that they had received earlier from the pipeline.
2020 Belarus–Russia
In February 2020, Belarus threatened to take oil from the Druzhba pipeline if Russia did not supply it with the required volumes of crude oil. As of February 2022, Russian oil supplies to Belarus had not been agreed to for 2020 and shipments had dwindled to 500,000 tonnes, down from a previously planned 2 million tonnes. Belarusian President Alexander Lukashenko said Moscow hinted at an energy supply deal in exchange for Belarus merging with Russia, which caused talks to collapse.
2023 comment on possible sabotage of pipeline
In 2023, apparent classified U.S. intelligence documents released in the 2022–2023 Pentagon document leaks included a note of a conversation between the President of Ukraine and Deputy Prime Minister Yulia Svyrydenko in which Volodymyr Zelensky suggested blowing up the Druzhba pipeline to hit Hungarian industry, as Orban's government was too friendly towards the Kremlin during the Russo-Ukrainian War. A Hungarian government official stated that this proposed sabotage by Zelensky prompted Hungary to block funding of the European Peace Facility.
See also
- Yamal–Europe pipeline
- Urengoy–Pomary–Uzhhorod pipeline
- Russia–Ukraine gas disputes
- Russia–Belarus energy dispute
- Baku–Tbilisi–Ceyhan pipeline - the next longest oil pipeline after Druzhba
References
- "The List: The Five Top Global Choke Points". Foreign Policy. May 2006. Archived from the original on 2006-12-07. Retrieved 2007-01-10.
- "Inpex Boosts Kazakhstan's Oil Exports to Germany via Druzhba Pipeline Network | Pipeline Technology Journal". www.pipeline-journal.net. Retrieved 2024-07-17.
- ^
"The Comecon Pipeline. Background Research". RFE/RL. 1960-09-06. Archived from the original on 2009-05-30. Retrieved 2008-01-02.
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ "Druzhba Pipeline". Pipelines International. 2009. Archived from the original on 2009-09-27. Retrieved 2009-11-19.
- ^ "История" [History] (in Russian). Transneft. Archived from the original on 2017-02-22. Retrieved 2016-12-17.
- "Russia Halts Pipeline Oil Supplies To Poland, Polish Refiner Says". Radio Free Europe/Radio Liberty. Reuters. 25 February 2023.
- "Germany's Schwedt refinery losing out in race from Russian oil". Reuters. 7 March 2023.
- "Kazakhstan to supply 150,000 tonnes of oil to Germany via Druzhba pipeline in Dec". 8 December 2023.
- Voiceof America: Hungary's foreign minister accuses EU of disrupting oil supplies from Russia, July 2024
- Reuters: EU declines Hungary's request for talks with Ukraine over oil sanctions, August 23, 2024
- "Belarus blocks Russian oil deliveries to Germany, Poland and Ukraine". International Herald Tribune. 2007-01-08. Archived from the original on 2007-09-07. Retrieved 2008-01-02.
- International Energy Agency (2003). Energy Policies of IEA Countries - Hungary (PDF). Organisation for Economic Co-operation and Development. pp. 67–70. ISBN 92-64-17096-0. Archived from the original (PDF) on 2009-05-30. Retrieved 2008-01-03.
- Anatoly Dozhin (2002-12-05). "Druzhba never gets old". Rossijskaya Gazeta. Transneft. Archived from the original on 2007-10-16. Retrieved 2007-12-29.
- ^ "Issues surrounding the privatisation of the petrochemical industry in the V4 countries". Visegrad.info. 2003-10-01. Archived from the original on 2016-03-14. Retrieved 2008-01-02.
- Socor, Vladimir (2007-05-24). "Russia to redirect massive oil volumes from Druzhba to Baltic pipeline". Eurasia Daily Monitor. The Jamestown Foundation. Archived from the original on 2016-02-13. Retrieved 2016-02-13.
- Geropoulos, Kostis (2007-05-26). "BPS-2 to redirect oil volumes from Druzhba pipeline". New Europe. Archived from the original on 2007-10-16. Retrieved 2007-12-29.
- "Russia builds Baltic oil pipeline to bypass Belarus". EurActiv. 2009-06-11. Archived from the original on 2009-06-19. Retrieved 2009-06-30.
- Groszkowski, Jakub (2012-04-18). "Czech concerns over the future of the Druzhba oil pipeline". CE Weekly. Centre for Eastern Studies. Archived from the original on 2012-05-11. Retrieved 2012-04-20.
- "Zagreb floats new pipe plan". Upstream Online. NHST Media Group. 2007-04-30. Archived from the original on 2009-05-30. Retrieved 2008-05-31.
- "Russia warns of oil supply cut-off through Ukraine, says Slovakia". France 24. 2009-12-28. Archived from the original on 2010-01-01. Retrieved 2009-12-29.
- "Russia agrees to higher oil transit fees with Ukraine's Naftogaz". France 24. 2009-12-28. Archived from the original on 2010-01-23. Retrieved 2009-12-29.
- "Russia Loses Billions in Druzhba Oil Pipeline Contamination Crisis". Forbes. 2019-05-10. Archived from the original on 2019-05-10. Retrieved 2019-05-11.
- "Who contaminated the petroleum supply in the Druzhba pipeline and caused Russian oil exports to be unusable for weeks? 'Meduza' investigates". Meduza. 2019-05-08. Archived from the original on 2019-05-09. Retrieved 2019-05-11.
- "Exclusive: Western buyers freeze payments for contaminated oil in extended Russian outage". Reuters. 2019-05-20. Archived from the original on 2019-05-20. Retrieved 2019-05-20.
- "Exclusive: Russia to take back dirty oil back from Belarus - sources". Reuters. 2019-05-24. Archived from the original on 2019-05-24. Retrieved 2019-05-24.
- "Russia removed 2 million tonnes of tainted Druzhba oil using rail, sea, storage: sources". Reuters. 2019-05-23. Archived from the original on 2019-05-24. Retrieved 2019-05-24.
- "Russia's Dirty Oil Crisis Is Worse Than Almost Anyone Predicted". Bloomberg. 2019-05-24. Archived from the original on 2019-05-25. Retrieved 2019-05-24.
- "Poland clears tainted oil from pipelines, 450,000 T remains in storage: RIA". RIA/Reuters. 2019-09-18. Archived from the original on 2019-09-19. Retrieved 2019-09-20.
- "France's Total tenders to sell 1.3 million barrels of tainted oil". RIA/Reuters. 2019-09-13. Archived from the original on 2019-09-19. Retrieved 2019-09-20.
- "Belarus to Russia: We'll siphon off your transit oil to Europe if necessary". Reuters. 14 February 2020. Archived from the original on 2020-02-14. Retrieved 2020-02-19.
- "Russia hints at Belarus joining it in a unified state in exchange for oil deal: Lukashenko". Reuters. 14 February 2020. Archived from the original on 2020-02-18. Retrieved 2020-02-19.
- "Page No Longer Available - The New York Times". The New York Times. Archived from the original on 2020-02-15. Retrieved 2020-02-19.
- "Zelensky, in private, plots bold attacks inside Russia, leak shows". washingtonpost.
- "Hungary blocks next tranche of EU tool to provide military support to Ukraine". euronews.com. 17 May 2023.
External links
- Druzhba-Adria Pipeline Integration Project, Transneft website
Pipeline systems of Russia by year of launch | ||
---|---|---|
Natural gas pipelines |
| |
Petroleum (oil) pipelines |
| |
Other pipelines |
|
- 1960 establishments in Europe
- Oil pipelines in Russia
- Oil pipelines in Ukraine
- Oil pipelines in Belarus
- Oil pipelines in Poland
- Oil pipelines in Slovakia
- Oil pipelines in the Czech Republic
- Oil pipelines in Hungary
- Oil pipelines in the Soviet Union
- Oil pipelines in Germany
- Buildings and structures built in the Soviet Union
- Transneft
- Eastern Bloc
- Comecon
- Foreign relations of the Soviet Union
- Czechoslovakia–Soviet Union relations
- East Germany–Soviet Union relations
- Germany–Soviet Union relations
- Hungary–Soviet Union relations
- Poland–Soviet Union relations