Artist's impression of an AEHF-2 satellite | |
Names | AEHF-2 Advanced Extremely High Frequency-2 |
---|---|
Mission type | Military communications |
Operator | United States Air Force / United States Space Force |
COSPAR ID | 2012-019A |
SATCAT no. | 38254 |
Website | https://www.spaceforce.mil/ |
Mission duration | 14 years (planned) 12 years, 7 months and 15 days (in progress) |
Spacecraft properties | |
Spacecraft | AEHF-2 |
Bus | A2100M |
Manufacturer | Lockheed Martin Space |
Launch mass | 6,168 kg (13,598 lb) |
Start of mission | |
Launch date | 4 May 2012, 18:24 UTC |
Rocket | Atlas V 531 (AV-031) |
Launch site | Cape Canaveral, SLC-41 |
Contractor | United Launch Alliance |
Orbital parameters | |
Reference system | Geocentric orbit |
Regime | Geosynchronous orbit |
Advanced Extremely High Frequency program← AEHF-1AEHF-3 → |
USA-235, also known as Advanced Extremely High Frequency 2 or AEHF-2, is a military communications satellite operated by the United States Air Force. It is the second of six satellite to be launched as part of the Advanced Extremely High Frequency program, which replaced the earlier Milstar system.
Satellite description
The USA-235 satellite was constructed by Lockheed Martin Space, and is based on the A2100 satellite bus. The satellite has a mass of 6,168 kg (13,598 lb) and a design life of 14 years. It will be used to provide super high frequency (SHF) and extremely high frequency (EHF) communications for the United States Armed Forces, as well as those of the United Kingdom, the Netherlands, and Canada.
Launch
USA-235 was launched by United Launch Alliance, aboard an Atlas V 531 flying from Space Launch Complex 41 (SLC-41) at the Cape Canaveral Air Force Station (CCAFS). The launch occurred at 18:24 UTC on 4 May 2012, first placing the satellite in a parking orbit of 185 kilometers by 905 kilometers. A second burn placed the satellite into a geostationary transfer orbit (GTO) with a perigee of 225 km (140 mi), an apogee of 50,031 km (31,088 mi), and 20.6° inclination. The satellite was successfully deployed in this orbit 51 minutes after launch.
See also
References
- ^ "Atlas V AEHF-2 - Mission Overview" (PDF). United Launch Alliance. Retrieved 17 May 2021.
- "AEHF 1, 2, 3, 4, 5, 6". Gunter's Space Page. 4 November 2020. Retrieved 17 May 2021.
- "Display: AEHF-2 2012-019A". NASA. 27 April 2021. Retrieved 17 May 2021. This article incorporates text from this source, which is in the public domain.
- "JSR # 658". Jonathan's Space Report. 7 May 2012. Retrieved 17 May 2021.
← 2011Orbital launches in 20122013 → | |
---|---|
January | |
February | |
March | |
April | |
May | |
June | |
July |
|
August | |
September | |
October | |
November | |
December | |
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ). Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses). |