Rail transportation in the Greater Manila Area

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Greater Capital Region Railway System
Clockwise (from top): PNR Metro Commuter, LRT Line 2, MRT Line 3, LRT Line 1Clockwise (from top): PNR Metro Commuter, LRT Line 2, MRT Line 3, LRT Line 1
Overview
OwnerGovernment of the Philippines
Department of Transportation
LocaleGreater Manila Area, Philippines
Transit typeUrban rail transit
Number of lines9 (4 currently operational)
Number of stations63 (operational)
Daily ridership1,100,000 (2024)
Annual ridership216,209,925 (as of 2022)
Technical
System length60.2 km (37.4 mi) (operational)
232.36 km (144.38 mi) (under construction)
Track gauge1,067 mm (3 ft 6 in) (PNR)
1,435 mm (4 ft 8+1⁄2 in) standard gauge (current and future lines)
System map

Rail transportation in the Greater Manila Area is a major part of the transportation system in Metro Manila and its surrounding areas. The railway network, collectively known as the Greater Capital Region Railway System, consists of the Manila Light Rail Transit System (LRT), Manila Metro Rail Transit System (MRT), and Philippine National Railways lines within the region.

The network makes up the majority of active railways in the country and bear the brunt of providing the metropolis with rail as a faster alternative mode of transport other than buses and jeepneys. However, these systems are currently insufficient for the rapidly expanding metropolis; to address this, new lines and line extensions are under construction, which will extend the system far out into neighboring regions.

Network

There are three primary rail systems in the region:

In 2022, the system served 601,195 passengers daily on average.

All lines are open every day of the year from 4:30 am PST (UTC+8) at the earliest until 10:15 pm at the latest. During Holy Week, a public holiday in the Philippines, the rail system is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes after Easter Sunday. During the Christmas and year-end holidays, the operating hours of the system are shortened due to the low ridership of the system during the holidays.

Line and color Status Opened Last extension Termini Stations Type Length
Metro Lines
LRT Line 1 Operational December 1, 1984 (1984-12-01) November 16, 2024 (2024-11-16) Fernando Poe Jr. Dr. Santos 25 Light rail 25.7 km (16.0 mi)
LRT Line 2 Operational April 5, 2003 (2003-04-05) July 5, 2021 (2021-07-05) Recto Antipolo 13 Heavy rail 17.6 km (10.9 mi)
MRT Line 3 Operational December 15, 1999 (1999-12-15) North Avenue Taft Avenue 13 Light rail 16.9 km (10.5 mi)
MRT Line 4 Planned 2028 (projected) N. Domingo Taytay 11 Heavy rail 15.56 km (9.67 mi)
MRT Line 5 Proposed
LRT Line 6 Proposed
MRT Line 7 Under Construction 2025 (projected) North Triangle San Jose del Monte 14 Heavy rail 22.8 km (14.2 mi)
PNR East-West Line (MRT Line 8) Proposed
Metro Manila Subway (MRT Line 9) Under Construction 2026 (projected) East Valenzuela Bicutan
NAIA Terminal 3
15 Heavy rail 36 km (22 mi)
MRT Line 10 Proposed
MRT Line 11 Proposed
Regional Lines
North–South Commuter Railway (NSCR) Under Construction 2031 (projected) New Clark City
Clark International Airport
Calamba 36 Commuter rail 147 km (91 mi)
Inter-Provincial Commuter October 7, 2022 Calamba Lucena 12 Commuter rail 86 km (53 mi)
Other transit lines
SkyTrain Guadalupe Uptown Bonifacio 2 People mover TBD
Lines and stations in italics are either under construction, not yet operational, or have been closed.

Stations

This section is an excerpt from List of rail transit stations in the Greater Manila Area § Summary.

There are 63 operational stations on the Greater Manila Area's rail network, with 38 from the LRT's two lines, 13 from the MRT's one line, and 12 from the PNR. There were also previously 35 operational PNR stations, but operations were suspended to give way for the construction of the North–South Commuter Railway (NSCR). In the future, 88 new stations are under construction and are planned to be opened: 39 for the MRT, 8 for the LRT, and 36 for the PNR, bringing the total to 146 stations.

All stations, except for Antipolo and the 12 operational stations of the PNR, are situated within Metro Manila, with several future stations planned for the surrounding regions. Six stations serve as interchanges where commuters can switch lines. However, these stations are distinct structures from one another and are considered independent of each other.

Stations often derive their names from the streets or localities they serve. Consequently, it is possible for two separate stations to have identical names even though they are not in proximity to each other. For instance, the PNR EDSA station is situated near the Magallanes Interchange, while the LRT EDSA station can be found on the intersection between Taft Avenue and EDSA.

History

Early rail systems

Further information: Tranvía and Philippine National Railways § History
The first steam-powered trains in the country ran on the Malabon Tranvía line.

Rail transportation in the Manila area dates back to 1878 when an official from Spain's Department of Public Works for the Philippines submitted a proposal for a Manila streetcar system, now referred to as the Tranvía. The system proposed was a five-line network emanating from Plaza San Gabriel in Binondo, running to Intramuros, Malate, Malacañan Palace, Sampaloc and Tondo. The project was approved and in 1882, Spanish-German businessman Jacobo Zóbel de Zangroniz, Spanish engineer Luciano M. Bremon, and Spanish banker Adolfo Bayo, founded the Compañia de los Tranvias de Filipinas to operate the concession granted by the Spanish colonial government. The first line opened in the system, the Tondo line, would open on December 9, 1883, predating the Ferrocarril de Manila–Dagupan by nine years, serving as the first rail transport in the country. Numerous other lines would open in the following years; the Intramuros line would open in 1886, the Sampaloc line in 1887, and the Malabón line in 1888.

The Ferrocarril de Manila–Dagupan, which constitutes much of the PNR North Main Line today, began construction on July 31, 1887, with the laying of the cornerstone for Tutuban station, and the 195-kilometer (121 mi) line opened on November 24, 1892. Expansion of the Philippine railway network would not begin until the American colonial period, when on December 8, 1902, the Philippine Commission passed legislation authorizing the construction of another railway line from Manila to Southern Luzon.

American period

With the American takeover of the Philippines, legislation was passed in 1909 authorizing further railway construction and the use of government bonds to finance them, and by 1916, 792.5 kilometers (492.4 mi) of track had been built by the company, which had reorganized itself as the Manila Railroad Company of New Jersey (MRR). The Manila Railroad Company, which preceded the PNR, operated various local trains between Manila and its neighboring provinces. Trains from Tutuban lead to Naic in Cavite, Pagsanjan in Laguna, Montalban in Rizal, and Bulacan during the 1920s.

Meanwhile, the Philippine Commission allowed the Manila Electric Railroad and Light Company (Meralco) to take over the properties of the Compañia de los Tranvias de Filipinas, with the first of twelve mandated electric tranvia (tram) lines operated by MERALCO opening in Manila in 1905. At the end of the first year around 63 kilometers (39 mi) of track had been laid. A five-year reconstruction program was initiated in 1920, and by 1924, 170 cars serviced many parts of the city and its outskirts. Although it was an efficient system for the city's 220,000 inhabitants, by the 1930s the streetcar network had stopped expanding. Much of the Tranvía network and rail services would be destroyed during World War II.

Post-war period

Following the war, the MRR was able to restore limited services, using surplus military equipment and payments made by the United States Army and the Philippine Commonwealth Army for use of railway facilities in the Philippines Campaign. However, the tram network was damaged beyond repair and was dismantled; jeepneys became the city's primary form of transportation, plying the routes once served by the tram lines. With the return of buses and cars to the streets, traffic congestion became a problem.

In 1966, the Philippine government granted a franchise to Philippine Monorail Transport Systems (PMTS) for the operation of an inner-city monorail. The monorail's feasibility was still being evaluated when the government asked the Japan International Cooperation Agency (JICA) to conduct a separate transport study. Prepared between 1971 and 1973, the JICA study proposed a series of circumferential and radial roads, an inner-city rapid transit system, a commuter railway, and an expressway with three branches. After further examination, many recommendations were adopted; however, none of them involved rapid transit and the monorail was never built. PMTS' franchise subsequently expired in 1974.

Meanwhile, the MRR's successor, the Philippine National Railways, opened its commuter service from Manila North Harbor to Biñan, Laguna. During this decade, more stations were opened although some were either closed or relocated. In 1976, the commuter system peaked and extended as far north as San Fernando, Pampanga, Guadalupe (located in Mandaluyong on the other side of Pasig River) to the east, and College to the south. There were also services in the now-defunct Carmona branch line.

Another study was performed between 1976 and 1977, this time by Freeman Fox and Associates and funded by the World Bank. It originally suggested a street-level railway, but its recommendations were revised by the newly formed Ministry of Transportation and Communications (now the Department of Transportation). The ministry instead called for an elevated system because of the city's many intersections. However, the revisions increased the price of the project from ₱1.5 billion to ₱2 billion. A supplementary study was conducted and completed within three months.

In 1978, at the request of the Philippine government, the Japan International Cooperation Agency conducted a study on the electrification of the PNR's north and south commuter lines in Metro Manila. The plan, formulated to keep up with the increasing demand for transportation in the Manila area, called for the replacement of the diesel-run trains and the electrification of the PNR commuter line. Two experts from the Japanese National Railways were sent to conduct the study.

Introduction of rapid transit

LRTA Class 1000 being built in Bruges in 1982

President Ferdinand Marcos created the Light Rail Transit Authority (LRTA) on July 12, 1980, by virtue of Executive Order No. 603 giving birth to what was then dubbed the "Metrorail". Construction of Metrorail started in September 1981. The line was test-run in March 1984, and the first half of the line from Baclaran to Central Terminal was opened on December 1, 1984. With the opening of its first segment, LRT Line 1 became the first rapid transit service in Southeast Asia. The second half, from Central Terminal to Monumento, was opened on May 12, 1985. Overcrowding and poor maintenance resulted in the system's inefficiency and disruptions to operations. The premature aging of Line 1 led to an extensive refurbishing and structural capacity expansion program with the help of Japan's ODA.

During the construction of the LRT Line 1, Electrowatt Engineering Services of Zürich also designed a comprehensive plan for metro service in Metro Manila. The plan—still used as the basis for planning new metro lines—consisted of a 150-kilometer (93 mi) network of rapid transit lines spanning all major corridors within 20 years. The plan would be revised in 1999 as the Metro Manila Urban Transportation Integration Study by the Japan International Cooperation Agency.

In the 1993 Updated Traffic and Transport Management Plan, which proposes the network of five LRT lines that were approved in 1995:

For the 1995 and 1999 MMUTIS master plans of a network, which revise the routes, they are:

  • LRT-1: Baclaran to Monumento, 15 km; existing
  • LRT-2: Recto to Katipunan, 10 km; later extended to Santolan for 2 km (12 km) as part of its revision
  • MRT-3: Monumento to Taft Avenue, 21 km
  • LRT-4: Old Bilibid to Batasan, 15 km, including a 7 km extension to Novaliches
  • LRT-5: Santa Mesa to Shaw/EDSA, 4 km, later removed from the government's project's list and omitted from the MMUTIS to merge with the extension of the planned Northrail
  • LRT-6: Baclaran to Zapote, 8 km, but the actual route is 12–15 km, and this line leads to Imus.

The construction of the Metro Rail Transit system's first line, MRT Line 3, would officially began in 1989 under the name "LRT-3" with the Hong Kong-based EDSA LRT Corporation winning the public bidding for the line's construction during the term of President Corazon Aquino. However, construction could not commence, with the project stalled as the Philippine government conducted several investigations into alleged irregularities with the project's contract. In 1995, the Supreme Court upheld the regularity of the project (G.R. No. 114222, April 6, 1995) which paved the way for construction to finally begin during the term of President Fidel V. Ramos. A consortium of local companies, led by Fil-Estate Management was later joined by Ayala Land, and 5 others, later formed the Metro Rail Transit Corporation (MRTC) in June 1995 and took over the EDSA LRT Corporation. Construction began on October 15, 1996, with a BLT agreement signed between the Philippine government and the MRTC. On December 15, 1999, the initial section from North Avenue to Buendia was inaugurated by President Joseph Estrada.

In 1990, the PNR's commuter system underwent renovations under the working title of Metrotrak. By May of that year, the system was inaugurated as Metrotren to distinguish it from the LRT Line 1, then named "Metrorail". However, the Metrotren system eventually suffered neglect due to lack of funding and maintenance. Plans for expansion and rehabilitation such as the Manila–Clark rapid railway project and Guadalupe line revival was also never realized. In addition, numerous natural disasters and neglect forced the line from Manila to Northern Luzon to close.

LRT Line 2 would begin construction in 1996, twelve years after the opening of LRT Line 1, with the granting of the soft loans for the line's construction. However, construction barely commenced, with the project stalled as the Philippine government conducted several investigations into alleged irregularities with the project's contract. The consortium of local and foreign companies, led by Marubeni Corporation, formed the Asia-Europe MRT Consortium (AEMC) which won the contract and restarted the project in 2000 after getting cleared from the allegations.

Expansion

Numerous rail projects would be completed in the early 2000s. On July 20, 2000, the rest of the MRT Line 3 stations opened a little over a month past the original deadline, due to DOTC's inclusion of additional work orders such as the Tramo overpass in Pasay leading to NAIA. Initially having low ridership due to high fares, the government subsidized fares to reduce the line's ticket prices, causing ridership to increase. On April 5, 2003, LRT Line 2's initial section, from Santolan to Araneta Center-Cubao was inaugurated by President Gloria Macapagal Arroyo, with all remaining stations opening on April 5, 2004, except for Recto which opened on October 29, 2004.

The NorthRail project was halted in 2011 and only a few pillars for the railway viaduct were built.

Rehabilitation of the PNR and Northrail

See also: North–South Commuter Railway § Northrail

The Arroyo administration attempted to modernize the PNR system by rebuilding the lines and purchasing new rolling stock. PNR purchased 6 brand new diesel multiple units from South Korea and became its first order in 35 years. The government also started the Northrail project, which would have revived the North Main Line from Tutuban to Malolos, with the first phase covering Caloocan to Malolos segment. The project was estimated to cost around US$500 million, and the funding was to be covered by a US$400 million by the Export–Import Bank of China, and the rest to be shouldered by the government through BCDA and NLRC. However, due to allegations of overpricing and other problems, the line's construction was repeatedly halted, until it was finally discontinued in 2011. The succeeding Aquino administration rebuilt the stations along the line to accommodate high-floor trains. PNR also acquired second-hand multiple units from Japan as stopgap measures to its train fleet, ending the Metrotren era.

Strong Republic Transit System

Main article: Strong Republic Transit System

The Strong Republic Transit System was launched in 2004 to integrate the various rail lines providing public transport in Manila in the Philippines. The program was initiated by former president Gloria Macapagal-Arroyo on June 14, 2003. It aimed to provide a "reliable, seamless and integrated mass transit system that would be at par with international standards" through the unification of already-existing rail infrastructure under one transit system and fare structure. The Manila Light Rail Transit System (Line 1 and Line 2), the Manila Metro Rail Transit System (Line 3) and the Philippine National Railways (PNR) Northrail and Southrail lines were covered by the SRTS project.

These are the existing and proposed lines under the SRTS:

  • LRT-1: Baclaran to Monumento and the extensions to North Avenue and Cavite
  • LRT-2: Recto to Santolan
  • MRT-3: North Avenue to Taft Avenue
  • MRT-7: North Avenue to San Jose del Monte
  • Northrail: Caloocan to Malolos
  • Southrail: Caloocan to Calamba

Contemporary history

Construction of the North–South Commuter Railway in Malolos, Bulacan.

Numerous extensions to the existing lines would be opened beginning in 2010. The construction of LRT Line 1's north extension to Roosevelt began in 2007 and would be completed by 2010. Originally supposed to end at North Avenue, bureaucracy in the Department of Transportation, corporate feud, and issues related to its proposed location hindered the station's construction, which would only begin in 2017. LRT Line 1 would also be privatized in 2015. Construction of another extension of the line up to Cavite began in 2019, partially opening in 2024 until Sucat. On July 5, 2021, the east extension of the LRT Line 2, which began construction in 2015, was opened to the public. The extension adds the Marikina and Antipolo stations, with the latter being the first rail transit station to be opened outside of Metro Manila.

However, the early 2010s were also marked by the deterioration of some lines. PNR's commuter line in the region would further decline as services were further suspended to Santa Rosa in 2014, and to Alabang in 2015 due to safety issues and accidents on the line. The national government would later procure new rolling stock and rehabilitate the line, enabling services to Governor Pascual in the north and IRRI in the south to be reopened by 2019. Meanwhile, MRT Line 3 deteriorated due to poor maintenance and overcrowding. As a response, the government started procuring additional trainsets in 2013, with the first trainsets received in 2016. However, various compatibility issues and the line's poor condition led to the trainsets only being used in limited capacity beginning in 2020. The rehabilitation of the line started in 2019 and was completed in 2021.

Several new railway projects are being undertaken by the national government and the private sector. These include the North–South Commuter Railway, the Metro Manila Subway, and MRT Line 7, all of which are under construction. Other line extensions and railway lines are in the planning stage.

For the 2020s proposal, the Greater Capital Region Railway System consists of seven lines:

Rolling stock

The railway systems in the Greater Manila Area use multiple types of rolling stock.

Manila LRT

An LRTA 2000 class train approaching Katipunan station
Main article: Manila Light Rail Transit System § Rolling stock

Four types of rolling stock run on the system, with three types used on Line 1 and another used on Line 2. Line 1 railway cars were made either in Belgium by La Bruggeoise et Nivelle, South Korea by Hyundai Precision and Adtranz (La bruggeoise et Nivelle and Adtranz are now part of Bombardier Transportation), or Japan by Kinki Sharyo and Nippon Sharyo. The Line 2, unlike the Line 1, runs heavy rail metro cars made in South Korea by Hyundai Rotem and provided by the Asia-Europe MRT Consortium led by Marubeni Corporation that have higher passenger capacity and maximum speed. All four types of rolling stock are powered by electricity supplied through overhead wires.

Of the two LRTA lines, the Line 2 prominently employs wrap advertising in its rolling stock. LRT Line 1 have also begun using wrap advertising as well initially for their second-generation trains, followed by their third-generation trains.

Manila MRT

A newly-overhauled MRTC 3000 class train at North Avenue station
Main article: Manila Metro Rail Transit System § Rolling stock

Currently, the system uses two types of rolling stock on its single line, MRT Line 3. Like LRT Line 1, the line uses light rail vehicles. The first railway cars were manufactured by ČKD Tatra in 1999. The second railway cars, commonly referred to as the Dalian Train, were manufactured by CRRC Dalian in 2016. The deployment of the Dalian trainsets was delayed due to several factors, including weight limits on existing tracks and inconsistencies in production, which has since been corrected. Though some train cars have passed validation tests, none of the Dalian trains are in operation for daily revenue services.

The MRT Line 4, Line 7, and the Metro Manila Subway will use heavy rail metro cars unlike Line 3, with the trains of the Metro Manila Subway being similar to that of the North–South Commuter Railway.

Philippine National Railways

A PNR 8100 class train near FTI station
Main articles: PNR Metro Commuter Line § Rolling stock, List of Philippine National Railways rolling stock, and North–South Commuter Railway § Rolling stock

The Metro Commuter Line has always used diesel-powered rolling stock since the services were opened in 1970. There were no new orders until 2009 when PNR ordered the Hyundai Rotem DMUs, followed by second-hand multiple units and coaches from Japan. PNR later ordered 7 new trains from Indonesian manufacturer PT INKA in 2018, subsequently increased to 9. The DOST Hybrid Electric Train also entered trial service the same year. The agency then commenced the refurbishment of its entire fleet the following year, which introduced polycarbonate windows that can resist stoning as well as a new livery. After all the INKA trainsets have arrived and the refurbishment of older trains are completed, the Hyundai Rotem DMUs and the INKA trainsets will become the Metro Commuter fleet while the older Japanese trainsets will be transferred to the Bicol Region for its new commuter service unless PNR decides otherwise.

The North–South Commuter Railway will use a total of 464 electric multiple unit train cars, equivalent to 58 train sets. 104 of these are the thirteen 8-car EM10000 class trainsets being built by the Japan Transport Engineering Company (J-TREC), while the other 304 will also be built by J-TREC with the same design and specifications to the EM10000 class trains. The trainsets are based on JR East commuter stock such as the E233 series but adopted to standard gauge. The first commuter train arrived on November 21, 2021. On the other hand, an order for 56 airport express trainsets (7 sets) was awarded to Mitsubishi Corporation and Spanish railcar manufacturer CAF in 2023.

Notes

  1. Combined ridership of the three currently operational lines as of December 2024.
  2. Combined annual ridership of the four operational lines back in 2022.
  3. ^ Located outside of the Greater Manila Area.
  4. Six future stations of the PNR are located outside of the Greater Manila Area. However, these stations are still considered part of the rail network and are listed below.

References

  1. Mangaluz, Jean (December 19, 2024). "Free LRT-1, LRT-2 and MRT rides on December 20". Philippine Star. Retrieved December 19, 2024.
  2. ^ Abadilla, Emmie V. (April 12, 2023). "10 regional airports up for sale - Bautista". Manila Bulletin. Retrieved April 13, 2023.
  3. "LOOK: Upcoming railway system to connect seven train lines in Greater Manila Area". Philstar Life. Retrieved August 13, 2024.
  4. "DOTr's Greater Capital Region railway system map previews 'operating lines by 2030'". Top Gear Philippines. Retrieved August 13, 2024.
  5. Rodriguez, Mia (September 6, 2023). "LOOK: Here's What Our Train Lines Might Be Like by 2030". Spot.PH.
  6. ^ "Praiseworthy progress in commuter rail infrastructure". The Manila Times. March 9, 2021. Archived from the original on March 24, 2021. Retrieved July 13, 2021.
  7. Relativo, James. "PNR to suspend Metro Manila operations to 'speed up NSCR project'". Philstar.com. Retrieved April 14, 2024.
  8. Ronda, Rainier Allan (March 31, 2010). "LRT, MRT closed for Holy Week". The Philippine Star. PhilStar Daily, Inc. Retrieved March 16, 2022.
  9. Grecia, Leandre (December 21, 2021). "Here are the LRT-1, LRT-2, MRT-3 schedules for Christmas 2021". Top Gear Philippines. Retrieved March 16, 2022.
  10. Subingsubing, Krixia (January 10, 2020). "MRT 4 project targeted for completion in 2025". Inquirer.net. Archived from the original on June 21, 2020. Retrieved July 13, 2021.
  11. "MRT 5 | PPP Center". ppp.gov.ph. Retrieved December 8, 2024.
  12. "Environmental Impact of LRT Line 6A, 6B, and 6C" (PDF).
  13. "MRT-7 more than 50% complete, set to open by Dec. 2022". CNN Philippines. February 19, 2021. Archived from the original on July 13, 2021. Retrieved February 20, 2021.
  14. "DOTr says Metro Manila Subway will be flood-proof". Inquirer.net. September 5, 2020. Archived from the original on September 22, 2020. Retrieved December 5, 2020.
  15. "MRT-11 Project | PPP Center". ppp.gov.ph. Retrieved December 8, 2024.
  16. "PNR relaunches Calamba - Lucena - Calamba line". PIA. October 7, 2022. Retrieved November 17, 2024.
  17. "PNR relaunches Calamba - Lucena - Calamba line". PIA. October 7, 2022. Retrieved July 12, 2024.
  18. Abadilla, Emmie V. (July 3, 2023). "P73-B Alabang-Calamba leg of NSCR breaks ground". Manila Bulletin. Retrieved June 13, 2024.
  19. Yu, Lance Spencer (March 8, 2024). "PNR will stop operations on March 28 for five years". RAPPLER. Retrieved June 13, 2024.
  20. "Proyecto de un tranvía de vapor de Manila a Malabón: 'Plano'", Map, vol. ULTRAMAR, MPD.6512 -, 1882, archived from the original on July 13, 2021, retrieved December 7, 2020
  21. ^ Orbon, Glenn; Dungca, Joana (2015). "The Philippine Railway System". Movement Systems.
  22. "Chapter I: Present Conditions". Report of Survey of the Manila Railroad Company and the Preliminary Survey of Railroads for Mindanao (Report). Chicago: De Leuw, Cather & Company. 1951. pp. 1–12.
  23. The Philippines' Oldest Business House. Makati: Filipinas Foundation. 1984. pp. 68–70.
  24. ^ Satre, Gary L. (June 1998). "The Metro Manila LRT System—A Historical Perspective" (PDF). Japan Railway and Transport Review. 16: 33–37. Archived from the original (PDF) on May 5, 2006. Retrieved May 8, 2006.
  25. ^ Manila Electric Company (Meralco). (November 10, 2004). "History of Meralco". Meralco company website. Archived from the original on September 18, 2009. Retrieved January 18, 2010.
  26. ^ "Light Rail Transit Authority Company History". Light Rail Transit Authority. Archived from the original on August 25, 2012. Retrieved October 7, 2012.
  27. Republic of the Philippines. (Approved: June 14, 1966). Republic Act No. 4652 – An Act Granting the Philippine Monorail Transit System, Incorporated a Franchise to Establish, Maintain and Operate a Monorail Transportation Service in the City of Manila and Suburbs and Cebu City and Province Archived February 16, 2020, at the Wayback Machine. Retrieved December 13, 2009, from the Chan Robles Virtual Law Library.
  28. Republic of the Philippines. (Enacted: October 4, 1971). Republic Act No. 6417 – An Act Amending Sections Three And Seven Of Republic Act Numbered Forty-Six Hundred Fifty-Two, Entitled "An Act Granting the Philippine Monorail Transit System, Incorporated a Franchise to Establish, Maintain and Operate a Monorail Transportation Service in the City Of Manila and Suburbs and Cebu City and Province" Archived September 15, 2019, at the Wayback Machine. Retrieved December 13, 2009, from the Chan Robles Virtual Law Library.
  29. "PNR Schedule effective September 11, 1976". www.flickr.com. Archived from the original on November 7, 2015. Retrieved July 23, 2020.
  30. "Old PNR stations". Reddit. Archived from the original on July 23, 2020. Retrieved July 23, 2020.
  31. "Carmona's Commuter Train". Times Journal. April 1973. Archived from the original on July 13, 2021. Retrieved July 23, 2020.
  32. ^ "REPORT ON STUDY OF THE ELECTRIFICATION OF THE PNR COMMUTER SERVICE" (PDF). Japanese International Cooperation Agency (JICA). December 1978. Archived (PDF) from the original on May 22, 2021. Retrieved February 15, 2021.
  33. Republic of the Philippines. (July 12, 1980). "Executive Order No. 603". Archived from the original on May 19, 2007. Retrieved February 15, 2010, from the Light Rail Transit Authority Website.
  34. Marasigan, Lorenz S. (January 28, 2021). "New trains for LRT-1 arrive in PHL | Lorenz S. Marasigan". BusinessMirror. Archived from the original on February 13, 2021. Retrieved July 13, 2021.
  35. The Line 1 System – The Yellow Line. . Light Rail Transit Authority. Retrieved January 19, 2010. Archived March 1, 2009, at the Wayback Machine
  36. Japan International Cooperation Agency. "Line 1 Capacity Expansion Project" (PDF). JICA official page. Archived from the original on July 13, 2021. Retrieved July 13, 2021.
  37. "Light Rail Transit Authority Company History". Light Rail Transit Authority. Archived from the original on September 24, 2014. Retrieved September 13, 2014.
  38. Abadilla, Emmie V. (July 1, 2021). "P4.5-B LRT-2 East Extension to start operation next week". Manila Bulletin. Archived from the original on July 11, 2021. Retrieved July 1, 2021.
  39. "Urban Railway Projects In Bangkok - Measures for Securing Financial Resources" (PDF).
  40. ^ "Malacañang okays five more LRT projects". Manila Standard. May 27, 1995. p. 17.
  41. "414896". 1994.
  42. Iwata, Shizuo (March 5, 1999). Final Report Summary (PDF). Metro Manila Urban Transportation Integration Study (Report). Japan International Cooperation Agency. Archived (PDF) from the original on October 2, 2021. Retrieved October 2, 2021.
  43. ^ Anonas, Alma S. (June 10, 1999). "On track and heading for Year 2K on MRT-3". Manila Standard. Kamahalan Publishing Corporation. Archived from the original on July 10, 2021. Retrieved January 21, 2014.
  44. Macaspac, Joem H.; Garcia, Ma. Luisa M. (March 28, 1996). "First phase of Edsa metro rail transit system under way". Manila Standard. Kamahalan Publishing Corporation. Archived from the original on July 10, 2021. Retrieved January 21, 2014.
  45. "Miracle rail project to rid Edsa of jams". New Straits Times. The New Straits Times Press (M) Bhd. December 15, 1999. Archived from the original on July 13, 2021. Retrieved January 21, 2014.
  46. "MetroTrak". Philippine Journal. Philippine News Agency. January 4, 1990. Archived from the original on July 13, 2021. Retrieved July 22, 2020.
  47. "Metrotren inaugural". Manila Chronicle. May 11, 1990. Archived from the original on July 13, 2021. Retrieved July 22, 2020.
  48. "Off track: Northrail timeline". ABS-CBN News. July 15, 2008. Archived from the original on February 17, 2019. Retrieved July 23, 2020.
  49. Camus, Miguel (July 16, 2015). "Gov't rolls out P171-B railway project". Philippine Daily Inquirer. Archived from the original on July 23, 2020. Retrieved July 23, 2020.
  50. "Manila Light Rail Transit Line 2 East Extension Line Starts Operation". Marubeni Corporation. July 6, 2021. Archived from the original on July 9, 2021. Retrieved July 8, 2021.
  51. "MRT 3 Fully Completed; Inauguration, Turnover Set on July 20". Manila Bulletin. Manila Bulletin Publishing Corporation. July 16, 2000. Archived from the original on July 13, 2021. Retrieved August 14, 2014.
  52. Trinidad, Andrea H. (January 2, 2000). "Metrostar Express proves a big disappointment". Philippine Daily Inquirer. Philippine Daily Inquirer, Inc. Archived from the original on July 13, 2021. Retrieved January 21, 2014.
  53. Japan International Cooperation Agency. "Metro Manila Strategic Mass Rail Transit Development" (PDF). JICA Official Page. Archived from the original on July 13, 2021. Retrieved July 13, 2021.
  54. Bergonia, Allan. (October 28, 2004). "Line 2 Recto Station Opens". People's Journal. Archived from the original on March 8, 2005. Retrieved May 11, 2006, from the LRTA Website.
  55. "Ballast Train in Tayuman". May 25, 2009. Archived from the original on July 13, 2021. Retrieved July 23, 2020.
  56. ^ "Off track: Northrail timeline". ABS-CBN News. July 15, 2008. Archived from the original on February 17, 2019. Retrieved February 17, 2019.
  57. ^ Inquirer, Philippine Daily (January 17, 2019). "WHAT WENT BEFORE: The Northrail Project". newsinfo.inquirer.net. Archived from the original on February 14, 2019. Retrieved February 16, 2019.
  58. "RP, China break ground for Manila–Ilocos railway". Malaya. April 6, 2004. Archived from the original on May 9, 2010.
  59. "Philippines: China-funded Northrail project derailed". Financial Times. Archived from the original on August 17, 2018. Retrieved July 23, 2020.
  60. Montecillo, Paolo (September 26, 2011). "PNR gets old trains from Japan". Archived from the original on July 23, 2020. Retrieved July 23, 2020.
  61. The Strong Republic Transit System, www.lrta.gov.ph, February 3, 2004
  62. Kris Bayos (February 4, 2015). "Common station at SM North EDSA pushed for Lines 1, 3, and 7". Manila Bulletin. Archived from the original on April 2, 2015. Retrieved March 24, 2015.
  63. Judith Balea (June 14, 2014). "Why SM is after the MRT-LRT common station". Rappler. Archived from the original on April 16, 2015. Retrieved March 26, 2015.
  64. Mick Basa (November 20, 2014). "DOTC eyeing another LRT-MRT common station". Rappler. Archived from the original on April 17, 2015. Retrieved March 26, 2015.
  65. Danessa O. Rivera (August 1, 2014). "SC stops DOTC, LRTA from building common station in front of Trinoma". GMA News. Archived from the original on April 8, 2015. Retrieved March 26, 2015.
  66. "Line 1 Cavite Extension and Operation & Maintenance". Public-Private Partnership Center. Archived from the original on March 16, 2015. Retrieved March 24, 2015.
  67. "Manila Light Rail Transit Line 1 (LRT-1) Cavite Extension". Railway Technology. Archived from the original on January 26, 2021. Retrieved September 14, 2020.
  68. Garcia, Leandre (July 5, 2021). "The new LRT-2 stations in Marikina and Antipolo are now operational". Top Gear Philippines. Archived from the original on July 11, 2021. Retrieved July 5, 2021.
  69. Macaraig, Ayee (May 6, 2014). "Senate panel: Extend PNR, improve services". Rappler. Archived from the original on July 23, 2020. Retrieved July 23, 2020.
  70. Corrales, Nestor (July 23, 2015). "PNR resumes Tutuban-Alabang train operations". Philippine Daily Inquirer. Archived from the original on June 19, 2020. Retrieved July 23, 2020.
  71. "PNR extends service to Malabon". Philstar.com. Archived from the original on December 13, 2018. Retrieved July 13, 2021.
  72. "You can now ride the PNR from Los Baños to Metro Manila". TopGear Philippines. Archived from the original on May 16, 2021. Retrieved July 13, 2021.
  73. Galvez, Daphne (March 1, 2022). "MRT 3 rehabilitation is finished, says Tugade". Philippine Daily Inquirer. Archived from the original on March 3, 2022. Retrieved March 12, 2022.
  74. Balinbin, Arjay L. (February 5, 2021). "Deployment of 25 tunnel-boring machines signals big push for subway completion". BusinessWorld. Archived from the original on February 6, 2021. Retrieved July 13, 2021.
  75. "Tutuban Center may become Manila's busiest station". ABS-CBN News. Retrieved March 21, 2015.
  76. "LOOK: Gov't to build 3 more Line 2 stations". ABS-CBN News. Archived from the original on January 23, 2020. Retrieved January 30, 2020.
  77. "DOTr's Greater Capital Region railway system map previews 'operating lines by 2030'". TopGear Philippines. Retrieved July 5, 2024.
  78. "LOOK: Here's What Our Train Lines Might Be Like by 2030". spot.ph. September 6, 2023. Retrieved July 6, 2024.
  79. The Line 2 System – The Purple Line. . Light Rail Transit Authority. Retrieved January 19, 2010. Archived March 17, 2009, at the Wayback Machine
  80. Razon, Evangeline M. (June 1998). "The Manila LRT System" (PDF). Japan Railway and Transport Review. 16: 38–39. Archived from the original (PDF) on August 24, 2009. Retrieved December 15, 2009.
  81. Otaki, Tsutomu. (2007). "The Commissioning – In Case of a Project in Manila" (PDF). KS World. 14. Kinki Sharyo: 12–13. Archived from the original (PDF) on March 28, 2012. Retrieved January 15, 2010.
  82. Marubeni Philippines. . Infrastructure. Retrieved February 17, 2010, from the Marubeni Philippines Website. Archived January 26, 2010, at the Wayback Machine
  83. "Order Received to Supply 240 Train Cars for Philippines' Metro Manila Subway". sumitomocorp.com. Sumitomo Corporation. December 21, 2020. Archived from the original on January 23, 2021. Retrieved July 13, 2021.
  84. Uy, Jocelyn (July 20, 2016). "PNR tracks sought for test runs". Philippine Daily Inquirer. Archived from the original on June 7, 2021. Retrieved July 23, 2020.
  85. "Order Received to Supply 304 for the Philippines' North-South Commuter Railway Extension Project". Sumitomo Corporation. March 18, 2022. Archived from the original on March 20, 2022. Retrieved March 28, 2022.
  86. "First 8-car trainset for PNR Clark Phase 1 arrives in PH". ABS-CBN News. November 21, 2021. Archived from the original on November 21, 2021. Retrieved November 22, 2021.
  87. Rosales, Elijah Felice (October 10, 2023). "Mitsubishi bags P9 billion airport train deal". Philstar. Retrieved October 10, 2023.

Further reading

Rail transportation in the Greater Manila Area
Italicized stations are either under construction, not yet operational, or have been closed.
Manila Light Rail Transit System
Line 1
South extension
Line 2
West extension
Line 6
Manila Metro Rail Transit System
Line 3
Line 4
Line 7
Line 8
MMS
NAIA spur
Philippine National Railways
Metro Commuter Line
Metro North
Metro South
North–South Commuter Railway
Transportation in Metro Manila
Government
Roads
Rail
LRT
MRT
PNR
Water
Aviation
Related
Transportation in the Philippines
Government
Road
Roads
Vehicles
Other
Rail
Railways
Rail transit
Water
Aviation
Payment
Intermodal terminals
Related articles
Italics indicate defunct, proposed, or under construction.
Urban rail transit in Southeast Asia
Indonesia Indonesia
Java
Sumatra
Lesser Sunda Islands
Laos Laos
Malaysia Malaysia
Peninsular Malaysia
East Malaysia
Myanmar Myanmar
Philippines Philippines
Luzon
Visayas
Mindanao
Singapore Singapore
Thailand Thailand
Bangkok Metropolitan
Provincial
Vietnam Vietnam
Note: Under construction & planned lines are in Italics
Rapid transit in Asia
 Armenia
 Azerbaijan
 Bangladesh
 China (PRC)
 Georgia
 India
 Indonesia
 Iran
 Japan
 Kazakhstan
 North Korea
 Malaysia
 Pakistan
 Philippines
 Qatar
 Russia
 Saudi Arabia
 Singapore
 South Korea
 Taiwan (ROC)
 Thailand
 Turkey
 United Arab Emirates
 Uzbekistan
 Vietnam
* Under construction.
Categories: