Misplaced Pages

Eroilor metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Bucharest metro station
Eroilor
Eroilor metro station in 2022
General information
LocationEroilor Boulevard
Sector 5, Bucharest
Romania
Platforms3 – Two island, one side platform on different levels.
Tracks5
Construction
Structure typeUnderground
History
Opened19 November 1979 (M1/3)
15 September 2020 (M5)
Services
Preceding station Bucharest Metro Following station
Eroilor 1 (upper level)
Grozăveștitowards Dristor 2 Line M1 Izvortowards Republica
Politehnicatowards Preciziei Line M3 Izvortowards Anghel Saligny
Eroilor 2 (lower level)
Academia Militarătowards Râul Doamnei or Valea Ialomiței Line M5 Terminus

Eroilor is a metro station in Bucharest. It is located near the Cotroceni neighbourhood, servicing the Bucharest Metro lines M1, M3, and M5.

Notable buildings in its vicinity are the Bucharest Opera house, the Bucharest Opera Business Center, the Faculty of Law of the University of Bucharest, the Carol Davila University of Medicine and Pharmacy, the University Emergency Hospital Bucharest [ro], one of the buildings of the University of Agronomic Sciences and Veterinary Medicine of Bucharest, and the New St. Eleftherios Church.

History

The station was opened on 19 November 1979 as part of the inaugural section of Bucharest Metro, between Semănătoarea and Timpuri Noi. On 19 August 1983, the extension to Industriilor was opened. On 15 September 2020, the inaugural section of M5, from Eroilor to Valea Ialomiței and Râul Doamnei started operation.

As part of the M5 Line (Drumul TabereiUniversitatePantelimon), a new terminal, Eroilor 2, was constructed underneath the existing platforms. It was opened on 15 September 2020.

Details

Eroilor is the last station where lines M1 and M3 run together, each diverging towards different directions (in the westbound direction). It is thus also where M1 and M3 meet in their eastbound directions. The station itself has three tracks – a central platform with two lateral tracks (track 1 and 3) and a lateral platform serving track 2. Trains coming from Grozăvești (M1) use track 3, trains coming from Politehnica (M3) use track 1, while trains coming from Izvor use track 2, no matter the direction they are going to follow requiring the use of an audio signal for identification of the line the train will follow. Behind the station walls, two other tracks exist (designated as tracks 4 and 5), that are used to store reserve trains, that are kept ready-to-run in case of another train malfunctioning or an unexpected increase in passenger loads. Track 4 however, is being currently converted to a passenger track (the wall separating it from track 2 will be demolished).

Until the completion of the Nicolae Grigorescu – Anghel Saligny line, the station was the terminus for line M3, that had been shortened to PrecizieiEroilor. Regular operation for M3 restarted on 6 July 2009, when M3 became Preciziei- Eroilor – Nicolae GrigorescuAnghel Saligny.

Colour scheme

The station was designed using a wide and open floorplan, with a dominant color scheme of white (obtained by using white marble columns) and pale yellow (from the floor tiles). These were initially intended to be complemented by a tone of red and orange through the use of red brick wall lining, of red and orange lighted signage and of incandescent light bulbs for some lateral illumination (it was the only station to use any incandescent light bulbs, all others were designed to use solely fluorescent lamps). However, as both the incandescent lamps and the orange signage were replaced with the more conventional fluorescent white tubes, these red tones disappeared.

References

  1. ^ Schwandl, Robert. "București". urbanrail.
  2. Bănilă, Nicoleta (15 September 2020). "Romania inaugurates 3.2 bln lei (659 mln euro) metro line in Bucharest". seenews.com. Retrieved 2020-09-15.
Bucharest Metro
Line M1
Line M2
Line M3
Line M4
Line M5
Planned lines
 Line M5 extension towards Pantelimon 
 Line M6 

Stations and lines in italics are planned or under construction.

Transport in Bucharest
Operators
Metro
Bus
Tram and Trolleybus
Mass transit
Metro
Bus
Tram interchange Tram
Trolleybus
Rail
Stations
Operators
Roads
Motorways
Expressways
National roads
Ring roads
County roads
Local roads
European routes
Airport interchange Air
Airports
Cycling
Water

44°26′08″N 26°04′29″E / 44.43548°N 26.07471°E / 44.43548; 26.07471

Categories: